Skip to content

Changelog

Owner: Martyn · Last reviewed: 12 October 2026 · Status: Live

A short dated list of significant changes: new sections, changed definitions, retired pages. Typo fixes and wording changes do not need a line.

Date Change
29 September 2026 Portal restructured into sections 0 to 10, following the growth portal architecture proposal of 23 September 2026. Social folded into Marketing as 5.3; Partner Agreements broadened into Partner Programme; Radar, Growth Roles, and Resources added.
29 September 2026 Proof moved from the touchstone into this repository as section 7, with case study production (7.5) and awards and recognition (7.6) added. Pricing stays in the touchstone.
29 September 2026 Section 0 open points resolved: the readers are the Growth Director and the SLT, and access is SLT only; Davs maintains the build and approves every pull request; Pricing is owned by Davs, with James; edit requests from people without GitHub go to the portal owner on Slack. Section 0 moved from Draft to Live.
30 September 2026 Section 2 pages written. 2.4 Qualification and Handover, with 2.4.1 What Qualified Means and 2.4.2 Handover and Bounce Rules, Live: the handover definition agreed with James and Davs on 22 September 2026, with the capability gate. 2.1 How the Pipeline Works and 2.3 Ideal Customer Profile added as Draft.
12 October 2026 2.1 How the Pipeline Works moved to Live, matched to the HighLevel build of 1 October 2026. The Sales stage Discovery is renamed Scoping, because Discovery is also a MAJOR service; 2.4, 2.4.1, and 2.4.2 updated to match. Source Channel options are now the twelve built, the Growth dashboard is split into Growth (TOFU) and Sales (MOFU/BOFU), and a workflow flags any Sales deal that sits in one stage for 14 days.